Speakers
Qiang Li
(Institute of High Energy Physics)
Yu Bao
(Institute of High Energy Physics)
Ziwen Pan
(University of Science and Technology, China)
Description
The Phase II upgrade project of the China Spallation Neutron Source includes the construction of a surface μ beam line and a μSR spectrometer, which will be the first μSR spectrometer built in China. Here we report the conceptual design of the spectrometer including the sample environment. Based on the design parameters of the muon beam, we design the spectrometer with a large number of detector units to maximize the counting rate. We designed the sample chamber with a fly-past structure to reduce the background. In this report we describe the conceptual design and simulation of the spectrometer.
Primary authors
Co-authors
Dr
Haitao Hu
(Institute of High Energy Physics)
Dr
Hui Cheng
(Institute of High Energy Physics)
Mr
Tianyi Yang
(University of Science and Technology of China)
YANG LI
(IHEP, CAS)