Speaker
Dr
Wonjun Lee
(RISP, IBS)
Description
Rare Isotope Science Project (RISP) launched in 2011 to build the Rare isotope Accelerator complex for ON-line experiment for rare isotope science (RAON), ends the 1st stage of which completes one of two main accelerators (low-energy superconducting linac, SCL). Since 2019, $\mu$SR facility has been designed and constructed, composed of muon production target chamber, transport beamline, beam dump, except spectrometer. In this talk, we report the current status of $\mu$SR facility in RAON as an applicative facility of RAON and a tool for investigating materials.
Primary author
Dr
Wonjun Lee
(RISP, IBS)
Co-authors
Mr
Jae Young Jeong
(Dept. of Nuclear Engineering, Hanyang Univ.)
Mr
Jae Chang Kim
(Dept. of Nuclear Engineering, Hanyang Univ.)
Mr
Yonghyun Kim
(Dept. of Nuclear Engineering, Hanyang Univ.)
Mr
Kihong Pak
(Dept. of Nuclear Engineering, Hanyang Univ.)
Mr
Byung Jick Lim
(Booil Co.)
Dr
Ju Hahn Lee
(RISP, IBS)
Prof.
Yong Kyun Kim
(Dept. of Nuclear Engineering, Hanyang Univ.)