21–24 Sept 2026
The Guildhall, York
Europe/London timezone

Session

Crystal Scintillators

21 Sept 2026, 16:40
The Guildhall (The Guildhall, York)

The Guildhall

The Guildhall, York

The Courtyard, Guildhall, Coney St, York YO1 9QN United Kingdom

Presentation materials

There are no materials yet.

  1. Alice Leoncini (Dipartimento di Fisica, Università di Roma “Tor Vergata”, I-00133, Rome, 8 Italy.)
    21/09/2026, 16:40
    Crystal Scintillators
    Presentation

    New measurements of the rare α decays of natural Hf isotopes have been performed using four Cs$_2$HfCl$_6$ crystal scintillators operated in the low-background setup of DAMA/CRYS at the Gran Sasso National Laboratory (LNGS) of INFN, Italy. The “source = detector” approach provides high sensitivity to ultra-long-lived processes by embedding the decaying nuclei directly within the detector...

    Go to contribution page
  2. Giovanni Benato (Gran Sasso Science Institute), Dr Miryam Martinez-Vara (Gran Sasso Science Institute)
    21/09/2026, 17:00
    Low-Background Assay Techniques
    Presentation

    The goal of the SURF$\alpha$CE (Silicon Underground Radiopure Finder of $\alpha$ Contamination Excesses) $\alpha$ spectrometer is to demonstrate the possibility to measure the surface radioactive contamination of the $^{232}$Th and $^{238}$U decay chains with an unprecedented sensitivity of 1 nBq/cm$^2$, a value demanded by several next-generation experiments for rare event searches. The...

    Go to contribution page
  3. Davide D'Angelo (Università degli Studi di Milano & INFN)
    21/09/2026, 17:20
    Crystal Scintillators
    Presentation

    The SABRE-North experiment aims to search for dark matter via the annual modulation signature, deploying an array of ultra-low-background NaI(Tl) crystals at Gran Sasso National Laboratory.
    The array will be composed of nine detectors (5 kg mass each) in a Cu and PE passive shielding. The expected background rate in the energy window of interest [1,6] keV is of the order of 0.5 dru.
    This...

    Go to contribution page
Building timetable...