STFC SOC project planning

Europe/London
Description

All documents are in the STFC SOC Teams file area

Attendees: DavidC, Philip, Jon, Alastair, IanC

Previous actions:

- Philip, clarify budget holder

Update: This is Paul Russell

- David: progress technical design doc

Update: Discussion of network layout leading to need for dedicated meeting. Hardware specs crystallising quickly with key remaining areas including memory for the container hosts (see technical design doc) and router requirements (but see separate meeting for this).

New/continuing actions:

  • David: arrange network meeting with JA,PG,JC,DC [Done: taking place next week]
  • David: share spreadsheet link (done by email)
  • Philip: Clarify best split for optical taps to feed directly into HPD room
  • David (with input from Alastair/etc): finalise hardware spec and technical design doc
  • David: Arrange another project meeting including Paul in two weeks (Done)
There are minutes attached to this event. Show them.
    • 11:00 11:10
      Actions from last meeting 10m
      • Philip: clarify budget holder
      • David: progress with technical design document
        • swiftly needed
      • All: determine who needs to be part of technical design review
        • when should this be in place
    • 11:10 11:20
      Progress made 10m
    • 11:20 11:30
      Questions to be answered 10m
    • 11:30 11:40
      Meeting cadence 10m
    • 11:40 11:50
      Actions arising 10m
    • 11:50 12:00
      AOB 10m