9 January 2025
Europe/London timezone

Metrics and timescales for answering q3a “Which is the preferred next major/flagship collider project for CERN?”

9 Jan 2025, 11:00
45m

Description

We would like community input on what the metrics should be for converging on an answer to q3a, and what timescale we should be aiming to provide an answer (i.e. before March 31st or after all community inputs have been submitted).
[15’] Framing discussion- summary of the additional information we expect to be available after 31st March i.e. updated HL-LHC projections, updated LEP3 proposal, linear collider visions update, ECFA e+e- study report, FCC feasibility study report (feel free to add others).
[30’] Preliminary discussion on FCC as CERN’s preferred project- we would like to have an open discussion about the community’s thoughts about:
-The risks of not committing to building the FCC tunnel now.
-The risks of committing to building the FCC tunnel now

Presentation materials

There are no materials yet.